Archive for January, 2006

Jan 25 2006

2006 Knit-alongs

Posted by Dee under General, Project Spectrum, Socks

Going away at the beginning of the year means I have been completely out of the loop in so many things in blogland. I knew it would be almost impossible to participate in Secret Pal this session as I will be away in March as well – and that was cool.

But now I have found out I miss the deadline for Sockapalooza – which I think is a good thing, as I am not that confident about my sock knitting capabilities, and I am not sure anyone would want sock I made. The obvious way to resolve this would be to sign up to something like Count Your Socks, but I think I might be too late – we shall see.

And then there is the wonderful concept of the Knitting Olympics – what an amazing idea – the only problem is I am having so many problems completing projects at the moment and I really should finish my mum’s twin set – but the thought of finishing a small project in 16 days really appeals. It will encourage me to have a FO in my gallery for 2006 – I even have a project planned the Crafter’s Circular Shrug – but I think I have to thing about this – maybe train a little first.

Project Spectrum

Then finally in Blogland found a no-pressure project. Lolly’s Project Spectrum, it is simple create something from a set colour each month – be it a sweater, scrapbooking page or bracelet – Lolly has explained it best on her blog – but is sounds perfect for me – now I can start scrap-booking rather then just buying supplies from eBay.

Jan 24 2006

“Miss” Me?

Posted by Dee under General, Travels, Wedding

 Me!

Jason and I on the 16th JanuaryI don’t really talk about non-crafty things in this journal I have a livejournal that I use for that kind of thing, But once in a while something amazing happens and it has to be recorded everywhere.

On the 16th January – 8 years after I started dating Jason we decided to get engaged. We had been talking about it for ages and brought the ring earlier this year – but decided to make it official whilst in Chicago on our anniversary.

Our wedding is now booked for next March and I am completely in wedding mode, as I prepare to no longer be a “miss.”

Needless to say very little knitting has been done and to make matters worst I have taken up scrapbooking to try and archive our engagement and wedding – now I really need an extra hour in the day.

Jan 05 2006

Now to our Normal Knitting Schedule

Posted by Dee under General, Socks, Sweaters

With all my Christmas knitting project now finished I can resume, my normal knitting schedule and in true knitting style I have several projects on the go. First off, I am making another Multidirectional Diagonal Scarf in the Hip-Knits Silk I brought last year, it was meant to be a summer top for me – but with the winter months rolling in a frogged it and have now decided it will be perfect for a thick winter scarf ready for our trip to Chicago next week.

Even though I have stopped knitting gifts, I seem to be busy knitting things for other people. My poor mum has been waiting since last May for her twin set, I finished the sweater part last September and it has been sitting in my knitting bag waiting to be blocked and for its partner to be made. So that has not been cast on, I am using the pattern from Sally Dallas’ Vintage Knits (I think this is the 6th Pattern I have done from this book).

Next on the needles is a pair of socks for my sister. She has the most awful trainers – Nike Air Rift, or pig’s trotters as we like to call them. The problem is you can’t wear normal socks with them – as there is a separator between the big toe and the rest of the toes. So when I saw the pattern for Geisha Socks in SpunMag, I immediately thought of her.